(1) Collect the necessary foundational materials for design. Product purification engineering plan, production planning, production methods and technologies, raw materials and intermediate commodity skill standards, product packaging methods and standards, construction planning, land use conditions, and special needs of the construction party; Original design materials should also be collected for renovation projects.
(2) Start to determine the workshop area and construction method. Based on the variety of products produced, planning, and construction planning, determine the functional rooms (cattle production area, auxiliary area) that should be set up in the dust-free workshop, and then contact the factory (determine the approximate construction area, construction method, or number of floors of the workshop according to the current planning status of the general table).
(3) Material balance calculation. Calculate material damage based on product production, production schedule, and production characteristics. For purification engineering, calculate the amount of materials (materials, accessories), packaging materials (bottles, stoppers, aluminum caps), and technical water consumption for each batch of production.
(4) Equipment selection. Based on the batch production determined by the material balance, select suitable equipment and quantity for single machine production and linkage line production, as well as the requirements of the construction unit.
(5) Workshop staffing. Determine the number of workshop personnel based on production volume and equipment selection operation requirements.
(6) Design of workshop purification engineering plan. After completing tasks (1-5) above, the graphic design can be carried out.
The article originates fromGuangxi Purification Project: http://www.jmyujie.com/
07-01
Guangdong Purification Engineering: What are the cleanroom construction companies?
Our cleanroom needs to go through several processes to be built. In the early stage, we need to start with the design, followed by the specific construction stage, and then the acceptance and other pr
12-19
A Brief Discussion on the Development Factors and Variables of Hunan Purification Engineering
Purification engineering can effectively utilize the six cost element variables mentioned below, provide selectable planning plans, improve fundamental purification engineering planning and standards,
11-27
How to effectively utilize the air conditioning system in the purification workshop of Hunan Purification Engineering Analysis
The energy consumption of HVAC system accounts for about 60% of building energy consumption, so energy conservation of HVAC is particularly important in building energy conservation. The purification
11-20
How to Reasonably Control and Mediate the Cost of Hunan Purification Engineering Analysis
When planning the manufacturing of purification engineering, how to achieve maximum benefits with minimal investment and complete maximum output has always been a highly valued issue for purification