Key points for controlling clean engineering materials and equipment
1. Cleanrooms should use materials that do not produce dust, do not accumulate dust, are corrosion-resistant, moisture-proof, and have simple cleaning and fire prevention functions. Wood and gypsum boards cannot be used as exterior decoration materials.
2. The insulation materials for air conditioning must comply with relevant national regulations and meet the requirements of corrosion resistance, no dust production, no dust adhesion, and fire prevention.
3. The air supply equipment for clean operating rooms should prioritize the use of factory made, installed, and easily installed finished products to avoid on-site processing.
4. Humidifiers should not be directly immersed in water, and dry steam humidifiers are preferred.
5. Wooden frame products and non barrier air purification equipment shall not be used for the final filter of the purification air conditioner.
6. After the processing and cleaning of the air duct section are qualified, both ends of the air duct should be protected with plastic film before being transported to the site for installation. All air duct accessories and equipment must be cleaned before installation, otherwise they cannot be installed.
7. Medical gases supplied by the hospital central station should be equipped with safety valves in the pipelines; Set up a main alarm device at the nurse station, but the main gas source should be sent to each gas consumption point after passing through the alarm device, and all should be controlled.
Article source: Hunan Purification Engineering http://www.jmyujie.com/
07-01
Guangdong Purification Engineering: What are the cleanroom construction companies?
Our cleanroom needs to go through several processes to be built. In the early stage, we need to start with the design, followed by the specific construction stage, and then the acceptance and other pr
12-19
A Brief Discussion on the Development Factors and Variables of Hunan Purification Engineering
Purification engineering can effectively utilize the six cost element variables mentioned below, provide selectable planning plans, improve fundamental purification engineering planning and standards,
11-27
How to effectively utilize the air conditioning system in the purification workshop of Hunan Purification Engineering Analysis
The energy consumption of HVAC system accounts for about 60% of building energy consumption, so energy conservation of HVAC is particularly important in building energy conservation. The purification
11-20
How to Reasonably Control and Mediate the Cost of Hunan Purification Engineering Analysis
When planning the manufacturing of purification engineering, how to achieve maximum benefits with minimal investment and complete maximum output has always been a highly valued issue for purification