Heating, ventilation, and air conditioning (HVAC) are crucial components in achieving a clean process environment in purification engineering, and the equipment is not only difficult but also messy. In order to improve the quality of clean room operation, it is necessary to pay close attention to various aspects.
In recent years, with the rapid development of China's economy and technology, some professions have continuously improved their requirements for production environments, and cleanrooms can provide excellent production environments. Compared with general buildings, clean room buildings have better control over noise, humidity, temperature, cleanliness, and other aspects. To a certain extent, they can also promote the progress of product processing and ensure the quality, precision, and purity of products. In the production process of clean room buildings in purification engineering, the quality of HVAC equipment construction can directly affect the quality of clean room operation, so purification engineering needs to pay more attention to HVAC equipment in clean rooms.
In the equipment engineering of the entire purification project clean room, the concept of cleanliness should be fully followed, whether it is in the selection of materials or in the management of construction, the concept of cleanliness should be served. To comply with the requirements of clean room construction control principles, construction personnel must wear clothing that meets the control requirements of different construction stages, and must not bring dust materials or things into the construction area.
In the construction of clean room HVAC equipment, attention should be paid to cooperation with other professions to prevent mutual setbacks during detailed construction. When facing opposition from other professions, active mediation and adjustment of construction plans should be carried out. The clean room has a relatively messy layout, and ensuring the clear space of the ceiling is very important. It requires harmonious HVAC professional exhaust pipes, return pipes, supply pipes, condensate pipes, return air pipes, water supply pipes, etc; Strong and weak electrical bridge frames in the field of electrical engineering; Drainage pipes, sprinkler pipes, sewage pipes, fire water pipes, daily water supply pipes, etc. in the field of water supply and drainage.
Article source: Hunan Purification Engineering http://www.jmyujie.com/
07-01
Guangdong Purification Engineering: What are the cleanroom construction companies?
Our cleanroom needs to go through several processes to be built. In the early stage, we need to start with the design, followed by the specific construction stage, and then the acceptance and other pr
12-19
A Brief Discussion on the Development Factors and Variables of Hunan Purification Engineering
Purification engineering can effectively utilize the six cost element variables mentioned below, provide selectable planning plans, improve fundamental purification engineering planning and standards,
11-27
How to effectively utilize the air conditioning system in the purification workshop of Hunan Purification Engineering Analysis
The energy consumption of HVAC system accounts for about 60% of building energy consumption, so energy conservation of HVAC is particularly important in building energy conservation. The purification
11-20
How to Reasonably Control and Mediate the Cost of Hunan Purification Engineering Analysis
When planning the manufacturing of purification engineering, how to achieve maximum benefits with minimal investment and complete maximum output has always been a highly valued issue for purification