With the development of society, the application of purification workshop engineering has become increasingly widespread. Compared to our traditional workshop, the purification workshop is one of the best projects nowadays, and its decoration requirements are also relatively high. You should know that any problems in the decoration of the purification project will weaken the functionality of the purification workshop and fail to achieve the expected goals. Below, Hunan Purification Engineering Company will introduce the overall construction process of the purification workshop project.
1. Confirm quotation and sign contract
One step in the decoration of a purification workshop is to select the decoration team. After the team selection, it is necessary to conduct on-site assessments and inform the other party of the requirements and standards for the use of the clean room. After providing a clear quotation based on these contents, sign the construction contract.
2. Installation of steel plate spacing
After signing the contract, the construction party needs to design the space and select materials based on the quotation. One step in the construction process is to ensure the safety of the steel plate spacing by constructing the entire space with steel plates. Relatively speaking, it will save more time while ensuring the safety and stability of the entire space.
3. Ceiling and Suspended Ceiling
After the framework of the entire space is built, it is necessary to install the ceiling. Before installing the ceiling, it is necessary to consider the various devices and equipment that need to be installed on the entire ceiling. For example, for purification lamps, air conditioners, etc., it is necessary to consider the height of the ceiling and the size of the space to avoid unnecessary problems in the later stage.
4. Ground construction
The next step is the decoration of the floor, which generally depends on the type of floor paint used in the entire purification room. During ground construction, it is necessary to ensure the flatness of the ground and not leave any gaps.
Article source: Hunan Purification Engineering http://www.jmyujie.com/
07-01
Guangdong Purification Engineering: What are the cleanroom construction companies?
Our cleanroom needs to go through several processes to be built. In the early stage, we need to start with the design, followed by the specific construction stage, and then the acceptance and other pr
12-19
A Brief Discussion on the Development Factors and Variables of Hunan Purification Engineering
Purification engineering can effectively utilize the six cost element variables mentioned below, provide selectable planning plans, improve fundamental purification engineering planning and standards,
11-27
How to effectively utilize the air conditioning system in the purification workshop of Hunan Purification Engineering Analysis
The energy consumption of HVAC system accounts for about 60% of building energy consumption, so energy conservation of HVAC is particularly important in building energy conservation. The purification
11-20
How to Reasonably Control and Mediate the Cost of Hunan Purification Engineering Analysis
When planning the manufacturing of purification engineering, how to achieve maximum benefits with minimal investment and complete maximum output has always been a highly valued issue for purification