How to optimize the air conditioning system of cleanroom engineering
The installation of air conditioning system is a key link in the construction of clean room engineering. The preparation of installation design materials, installation of air ducts, installation of components, and installation of air end devices in the clean room air conditioning system, as well as the compliance of each construction process with standards, will directly affect the decoration quality of the clean room project. Let's learn together how to optimize the air conditioning system for cleanroom engineering.
1、 The material preparation stage before the installation of the air conditioning system. The preparation and quality inspection of equipment and materials are important foundations for the smooth installation of air conditioning systems in cleanroom engineering. Air conditioning equipment and accessories need to be inspected and accepted before entering the site. Only when the equipment quality meets the relevant standards of cleanroom engineering can it enter the construction process. This step not only requires strict review of the completeness of equipment data, but also inspection of its appearance and quality compliance with specifications. If the quality of the air conditioning equipment does not meet the installation standards or the qualifications are incomplete, it cannot be accepted and constructed.
2、 Optimize the production and installation of air ducts. The air ducts commonly used in the air conditioning system of clean room engineering are divided into two types: main supply air ducts and main return air ducts. If the sealing and cleanliness of the two sections of air ducts cannot meet the standards, after the clean room is put into use, the air volume of the air conditioning system is relatively large, and the total pressure of the fan is relatively high. In addition, there will be a lot of dust generated in the car room. Therefore, strict requirements need to be placed on the cleanliness and airtightness of the air ducts when installing the air conditioning system of clean room engineering.
Article source: Guangdong Purification Engineering http://www.jmyujie.com/
07-01
Guangdong Purification Engineering: What are the cleanroom construction companies?
Our cleanroom needs to go through several processes to be built. In the early stage, we need to start with the design, followed by the specific construction stage, and then the acceptance and other pr
12-19
A Brief Discussion on the Development Factors and Variables of Hunan Purification Engineering
Purification engineering can effectively utilize the six cost element variables mentioned below, provide selectable planning plans, improve fundamental purification engineering planning and standards,
11-27
How to effectively utilize the air conditioning system in the purification workshop of Hunan Purification Engineering Analysis
The energy consumption of HVAC system accounts for about 60% of building energy consumption, so energy conservation of HVAC is particularly important in building energy conservation. The purification
11-20
How to Reasonably Control and Mediate the Cost of Hunan Purification Engineering Analysis
When planning the manufacturing of purification engineering, how to achieve maximum benefits with minimal investment and complete maximum output has always been a highly valued issue for purification