1、 The overall effectiveness of the air conditioning and ventilation engineering system depends not only on meeting the design requirements for room temperature and humidity, but also on the noise level of the room used, which is the key to the success or failure of the design.
2、 The main noise sources of the air conditioning and ventilation engineering system are:
1. Regular ventilation: exhaust fan, supply fan.
2. Ventilation and air conditioning engineering system: refrigeration unit, circulating water pump, cooling tower, air conditioning terminal (fan coil unit, air handling unit).
3. In case of fire: smoke exhaust fan, positive pressure supply fan.
4. Civil air defense ventilation engineering system: civil air defense fan.
The equipment that needs to control noise mainly includes air conditioning and ventilation engineering system equipment, as well as regular ventilation engineering equipment; The equipment for civil air defense ventilation engineering and the pressurized fan for ventilation and smoke exhaust engineering in case of fire can only be turned on during wartime or fire, and the noise cannot be controlled.
Article source: Hunan Purification Engineering http://www.jmyujie.com/
07-01
Guangdong Purification Engineering: What are the cleanroom construction companies?
Our cleanroom needs to go through several processes to be built. In the early stage, we need to start with the design, followed by the specific construction stage, and then the acceptance and other pr
12-19
A Brief Discussion on the Development Factors and Variables of Hunan Purification Engineering
Purification engineering can effectively utilize the six cost element variables mentioned below, provide selectable planning plans, improve fundamental purification engineering planning and standards,
11-27
How to effectively utilize the air conditioning system in the purification workshop of Hunan Purification Engineering Analysis
The energy consumption of HVAC system accounts for about 60% of building energy consumption, so energy conservation of HVAC is particularly important in building energy conservation. The purification
11-20
How to Reasonably Control and Mediate the Cost of Hunan Purification Engineering Analysis
When planning the manufacturing of purification engineering, how to achieve maximum benefits with minimal investment and complete maximum output has always been a highly valued issue for purification