Regarding the issue of floor materials in food cleanrooms, many people are confused and think that there is nothing important about the floor materials in food cleanrooms. Is it possible that food is still made on the ground. Food cannot be made on the ground, but the food workshop pays more attention to cleanliness and hygiene. During the food processing, the production of oil and fat is inevitable. If ordinary cement flooring or ceramic tiles are chosen, it is easy to produce dust, and the floor is not easy to clean and the joints provide a high-quality place for the growth of bacteria. So, what are the requirements for the floor of a food cleanroom?
What materials are used for the floor of food cleanrooms
The floor of the food clean room should be paved with anti slip, sturdy, non permeable, easy to clean, corrosion-resistant materials, and the ground surface should be flat without water accumulation.
2. The overall floor level of the food cleanroom should be slightly higher than that of the factory area during design and construction, with some sloping surfaces. The walls of the workshop should be covered with wall skirts that are at least 2 meters long. The walls should be made of corrosion-resistant, easy to clean and disinfect, sturdy, and non permeable materials, and coated with light colored, non-toxic, waterproof, anti mold, non easy to peel off, and washable materials.
3. There are often vehicles carrying heavy loads in the food workshop, such as forklifts. If the friction coefficient of the ground is low and not strong enough to withstand pressure, the vehicles passing by can easily cause slipping or the ground to break. Therefore, it is necessary to choose a floor with strong impact resistance, wear resistance, pressure resistance, and the ability to withstand the crushing of heavy objects.
The material selection for the floor of the food cleanroom is good, which not only has a significant effect on durability, but also ensures that the floor can have good dust and oil resistance during food production.
Article source: Hunan Purification Engineering http://www.jmyujie.com/
07-01
Guangdong Purification Engineering: What are the cleanroom construction companies?
Our cleanroom needs to go through several processes to be built. In the early stage, we need to start with the design, followed by the specific construction stage, and then the acceptance and other pr
12-19
A Brief Discussion on the Development Factors and Variables of Hunan Purification Engineering
Purification engineering can effectively utilize the six cost element variables mentioned below, provide selectable planning plans, improve fundamental purification engineering planning and standards,
11-27
How to effectively utilize the air conditioning system in the purification workshop of Hunan Purification Engineering Analysis
The energy consumption of HVAC system accounts for about 60% of building energy consumption, so energy conservation of HVAC is particularly important in building energy conservation. The purification
11-20
How to Reasonably Control and Mediate the Cost of Hunan Purification Engineering Analysis
When planning the manufacturing of purification engineering, how to achieve maximum benefits with minimal investment and complete maximum output has always been a highly valued issue for purification