How can operating room purification engineering meet the functional requirements of hospitals

2023-09-01 2348

1、 Characteristics of hospital clean operating rooms

The planning and production of hospital clean operating rooms is a systematic project involving multiple disciplines and specialties, such as medical and health care, air conditioning purification, water supply and drainage, construction and decoration, electrical lighting, and communication self-control. To a certain extent, it is a combination of modern hygiene, engineering, medical construction, and purification systems.

The purpose of creating a hospital clean operating room is to artificially manipulate the sterile space of the operating room, in order to prevent microbial damage, reduce and avoid postoperative infections, which is actually within the scope of biological clean rooms. By effectively manipulating the production, transmission, and reproduction of pathogens and viruses, effective control over postoperative infections can be truly achieved.

湖南净化工程

2、 Initial preparation for the production of hospital clean engineering operating rooms

The confirmation of functional requirements requires careful consultation with the hospital before construction. The hospital's functional requirements for clean operating rooms should be organically combined with the actual situation, and the production plan, quantity, level, and functional requirements should be clearly defined one by one. Based on this, each operating room should be equipped with corresponding functional settings and special equipment.

The confirmation of medical equipment and automation control level is not only reflected in the modernization of building construction, but also in the modernization of related medical supporting facilities and equipment in modern operating rooms. Therefore, in the preliminary preparation of the operating room, the specific brand, model, operating parameters, and mode elements of the medical equipment in the operating room should be confirmed in advance, and based on these elements, a corresponding complete plan should be formulated and adjusted in the planning and construction preparation.

The confirmation of various equipment interfaces is necessary to avoid frequent rework and dismantling due to ineffective docking of related medical equipment after the construction of the operating room. In the early stages of production, it is necessary to confirm the pathways, directions, and locations of various embedded pipelines, strong and weak electrical interfaces on site based on the functional requirements drawings provided by the corresponding equipment manufacturers, in order to facilitate the normal installation and debugging of various equipment in the later stage.