Due to the high requirements for construction products in the factory purification project, the main requirements are sealing and cleanliness. So in the location selection process, it is necessary to strictly follow the site selection requirements. Choosing a good location can lay a good foundation for energy conservation in later plant purification projects.
1、 The distance between the project and the main traffic road should not be less than 50 meters.
2、 Circular fire lanes should be set up around the purification project of the factory building. If there are difficulties, fire lanes can be set up along both sides of the factory building.
3、 It should be arranged in areas within the factory area where the environment is clean and the flow of people and goods does not or rarely cross.
4、 For the location selection of factory purification projects that require micro vibration control, the vibration impact of existing vibration sources around should be measured and compared with the allowable environmental vibration values of accurate equipment and instruments.
5、 When there is a chimney on the upwind side of the high-frequency wind direction in the factory purification project, the horizontal distance between the design of Hunan Purification Engineering Company and the chimney should not be less than 12 times the height of the chimney.
6、 The road surface layer around the factory purification project should be made of materials with good integrity and low dust generation.
Hunan Purification Engineering Company
7、 Greening should be carried out around the factory purification project. Lawn can be planted, trees that do not have harmful effects on atmospheric dust concentration can be planted, and a green community can be formed. But it shall not hinder firefighting operations.
8、 Should be located in areas with low atmospheric dust concentration and good natural environment;
9、 Keep away from areas with serious air pollution, vibration, or noise interference, such as railways, docks, airports, transportation arteries, factories, warehouses, and yards that emit large amounts of dust and harmful gases. If it is not possible to stay away from severe air pollution sources, it should be located on the upwind side of the higher frequency wind direction, or on the downwind side of the lower frequency wind direction throughout the year.
Article source: Hunan Purification Engineering http://www.jmyujie.com/
07-01
Guangdong Purification Engineering: What are the cleanroom construction companies?
Our cleanroom needs to go through several processes to be built. In the early stage, we need to start with the design, followed by the specific construction stage, and then the acceptance and other pr
12-19
A Brief Discussion on the Development Factors and Variables of Hunan Purification Engineering
Purification engineering can effectively utilize the six cost element variables mentioned below, provide selectable planning plans, improve fundamental purification engineering planning and standards,
11-27
How to effectively utilize the air conditioning system in the purification workshop of Hunan Purification Engineering Analysis
The energy consumption of HVAC system accounts for about 60% of building energy consumption, so energy conservation of HVAC is particularly important in building energy conservation. The purification
11-20
How to Reasonably Control and Mediate the Cost of Hunan Purification Engineering Analysis
When planning the manufacturing of purification engineering, how to achieve maximum benefits with minimal investment and complete maximum output has always been a highly valued issue for purification